After that, watch for the D3 and D4 lights to stop flashing and continue to be continuous,indicating which the equipment is in the reboot-Completely ready point out (Usually do not electric power from the device duringthe reboot approach).KS0 Pro ASICs will need Distinctive attention to cooling. The power levels on these now operate very sizzling,